Unsupervised machine learning for identifying key risk factors contributing to construction delays

Al-Bataineh Fuad, Khatatbeh Ahmed Ali and Alzubi Yazan ()
Additional contact information
Al-Bataineh Fuad: Department of Civil Engineering, Faculty of Engineering, Al-al Bayt University, Mafraq, Jordan
Khatatbeh Ahmed Ali: Department of Civil Engineering, Faculty of Engineering, Al-al Bayt University, Mafraq, Jordan
Alzubi Yazan: Department of Civil Engineering, Faculty of Engineering Technology, Al-Balqa Applied University, Amman, Jordan

Organization, Technology and Management in Construction, 2024, vol. 16, issue 1, 170-185

Abstract: The present study uses unsupervised machine learning capabilities with an emphasis on K-means clustering for addressing the problem of construction delays. The primary objective is to investigate the critical risk factors that contribute to such delays, thereby enabling more efficient risk-management strategies. The study employs a large dataset compiled from contracting firms operating in developing regions. This information is a vital resource for identifying crucial risk variables. These variables are analysed and categorised using the Likert scale into five levels based on their potential influence. This systematic approach permits the development of a comprehensive understanding of the relevant factors. These risk factors are grouped to enhance comprehension of the intricate risk landscape using K-means clustering. This allows for a broader, more comprehensive understanding of the factors contributing to construction delays. The application of K-means clustering demonstrates the potential of machine learning techniques to improve conventional approaches to risk management. This empirical investigation significantly expands the existing body of construction risk-management knowledge. It offers invaluable insights into various project stakeholders, allowing for more informed decision-making. Notably, the clustering analysis results provide a practical, user-friendly tool. This tool can assist project managers in enhancing their risk foresight, drafting more effective plans and developing robust mitigation strategies. Consequently, this research offers the potential for substantial improvements in project timeline adherence, thereby substantially reducing the impact of construction delays in developing nations.

Keywords: Machine learning; Unsupervised learning; Construction management; Project management; Delays (search for similar items in EconPapers)
Date: 2024
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://doi.org/10.2478/otmcj-2024-0014 (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:vrs:otamic:v:16:y:2024:i:1:p:170-185:n:1014

DOI: 10.2478/otmcj-2024-0014

Access Statistics for this article

Organization, Technology and Management in Construction is currently edited by Mladen Radujković

More articles in Organization, Technology and Management in Construction from Sciendo
Bibliographic data for series maintained by Peter Golla ().

 
Page updated 2025-03-20
Handle: RePEc:vrs:otamic:v:16:y:2024:i:1:p:170-185:n:1014