Project ambidexterity: case of recovering schedule delay in a brownfield airport project in India
Iyer K. Chandrashekhar () and
Banerjee Partha S.
Additional contact information
Iyer K. Chandrashekhar: Department of Civil Engineering, Indian Institute of Technology–Delhi110016, India
Banerjee Partha S.: Deft Advisory and Research Pvt. Ltd., New Delhi110019, India
Organization, Technology and Management in Construction, 2016, vol. 8, issue 1, 1464-1481
Abstract:
Planning deficiencies and consequent execution delays are likely to persist in infrastructure development projects. However, recovery of schedule delay is a less researched area. This case research, using a two-stage inquiry modeled on the grounded theory, studied the schedule delay recovery during the execution phase of a brownfield airport construction project. The analyses generated contextual evidence and ambidexterity was found to be the key underlying phenomenon for successful recovery measures. The empirical learning was validated with literature and can be used by practitioners looking to institute schedule recovery measures.
Keywords: grounded theory; project ambidexterity; brownfield project; schedule delay recovery; airport construction project (search for similar items in EconPapers)
Date: 2016
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1515/otmcj-2016-0012 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:vrs:otamic:v:8:y:2016:i:1:p:1464-1481:n:12
DOI: 10.1515/otmcj-2016-0012
Access Statistics for this article
Organization, Technology and Management in Construction is currently edited by Mladen Radujković
More articles in Organization, Technology and Management in Construction from Sciendo
Bibliographic data for series maintained by Peter Golla ().