EconPapers    
Economics at your fingertips  
 

An optimization problem of manufacturing systems with stochastic machine breakdown and rework process

Singa Wang Chiu

Applied Stochastic Models in Business and Industry, 2008, vol. 24, issue 3, 203-219

Abstract: This paper is concerned with optimization of production run time that takes stochastic breakdown and the reworking of defective items into consideration. In a real‐life manufacturing process, production of imperfect quality items as well as random breakdowns of production equipment is inevitable. All defective items produced are assumed to be repairable through a rework process right after the regular production stops in each cycle. This research starts with derivations of the cost functions for production systems with breakdown (no‐resumption policy is considered) and without breakdown taking place, respectively. Then cost functions of both cases are integrated. Theorems on conditional convexity of the overall cost function and bounds for optimal production run time are proposed and proved. This study concludes that although the optimal run time cannot be expressed in a closed form, it falls within the range of bounds. Hence, it can be pinpointed by the use of the bisection method based on the intermediate value theorem. A numerical example is provided to demonstrate its practical usages. Copyright © 2007 John Wiley & Sons, Ltd.

Date: 2008
References: View complete reference list from CitEc
Citations: View citations in EconPapers (3)

Downloads: (external link)
https://doi.org/10.1002/asmb.699

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wly:apsmbi:v:24:y:2008:i:3:p:203-219

Access Statistics for this article

More articles in Applied Stochastic Models in Business and Industry from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-20
Handle: RePEc:wly:apsmbi:v:24:y:2008:i:3:p:203-219