On‐line evaluation of the stability of an inspection process
Isabel González and
Ismael Sánchez
Applied Stochastic Models in Business and Industry, 2009, vol. 25, issue 6, 719-736
Abstract:
This article proposes control charts to monitor an inspection process based on the defective proportion of the inspected parts. The focus is on inspection process where the incoming parts form a sequence of independent units, such as unrelated clients arriving at a service facility. An example of this kind of inspection process is the periodic motor vehicle (PMVI) inspection. The effectiveness of the proposed control is evaluated using Monte Carlo experiments and is applied to an actual PMVI station. Copyright © 2009 John Wiley & Sons, Ltd.
Date: 2009
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1002/asmb.755
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:apsmbi:v:25:y:2009:i:6:p:719-736
Access Statistics for this article
More articles in Applied Stochastic Models in Business and Industry from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().