UNCERTAINTY IN PROCUREMENT CONTRACTING WITH TIME INCENTIVES

Wenzheng Gao, Daiqiang Zhang and Naibao Zhao

International Economic Review, 2021, vol. 62, issue 3, 1153-1197

Abstract: This article studies cost‐plus‐time (A+B) procurement contracting with time incentives in the highway construction industry. In the presence of construction uncertainty, the contractor's actual completion time may deviate from the bid completion time, and the A+B contract design is not ex post efficient. Using data from highway procurement contracts in California, we show that an ex post efficient lane rental contract would reduce the social cost by $41.39 million (43.11%) on average. Moreover, the average commuter cost would decrease by $62.06 million (78.96%), suggesting a substantial reduction in the construction externality to commuters from lane rental contracts.

Date: 2021
References: View references in EconPapers View complete reference list from CitEc
Citations: Track citations by RSS feed

Downloads: (external link)
https://doi.org/10.1111/iere.12509

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wly:iecrev:v:62:y:2021:i:3:p:1153-1197

Ordering information: This journal article can be ordered from
http://www.blackwell ... bs.asp?ref=0020-6598

Access Statistics for this article

International Economic Review is currently edited by Michael O'Riordan and Dirk Krueger

More articles in International Economic Review from Department of Economics, University of Pennsylvania and Osaka University Institute of Social and Economic Research Association 160 McNeil Building, 3718 Locust Walk, Philadelphia, PA 19104-6297. Contact information at EDIRC.
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2022-01-04
Handle: RePEc:wly:iecrev:v:62:y:2021:i:3:p:1153-1197