Scheduling Shipbuilding Using a Constraint Directed Graph Search: DAS‐ERECT
Jae Kyu Lee,
Hyung Rim Choi,
Ok Ryul Yang and
Ho Dong Kim
Intelligent Systems in Accounting, Finance and Management, 1994, vol. 3, issue 2, 111-125
Abstract:
To build a scheduling system for shipbuilding, we have adopted a hierarchical architecture and developed a constraint directed graph search technique for erection scheduling at the dock. First, in the hierarchical architecture, detailed schedules for the lower‐level assembly plants are delegated to the individual plant's schedulers as long as the requirements from the higher‐level scheduler are satisfied. However, if lower‐level scheduling is impossible, the higher‐level scheduler attempts to adjust the original requirements. Second, in the constraint directed graph search, the concepts of graph expansion and constraint directed pruning are amalgamated into an algorithm. The approaches are implemented in the DAS‐ERECT system which is a sub‐system of the DAS project undertaken for the Daewoo Shipbuilding Company.
Date: 1994
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1002/j.1099-1174.1994.tb00060.x
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:isacfm:v:3:y:1994:i:2:p:111-125
Ordering information: This journal article can be ordered from
http://www.blackwell ... bs.asp?ref=1099-1174
Access Statistics for this article
More articles in Intelligent Systems in Accounting, Finance and Management from John Wiley & Sons, Ltd.
Bibliographic data for series maintained by Wiley Content Delivery ().