EconPapers    
Economics at your fingertips  
 

Scheduling Shipbuilding Using a Constraint Directed Graph Search: DAS‐ERECT

Jae Kyu Lee, Hyung Rim Choi, Ok Ryul Yang and Ho Dong Kim

Intelligent Systems in Accounting, Finance and Management, 1994, vol. 3, issue 2, 111-125

Abstract: To build a scheduling system for shipbuilding, we have adopted a hierarchical architecture and developed a constraint directed graph search technique for erection scheduling at the dock. First, in the hierarchical architecture, detailed schedules for the lower‐level assembly plants are delegated to the individual plant's schedulers as long as the requirements from the higher‐level scheduler are satisfied. However, if lower‐level scheduling is impossible, the higher‐level scheduler attempts to adjust the original requirements. Second, in the constraint directed graph search, the concepts of graph expansion and constraint directed pruning are amalgamated into an algorithm. The approaches are implemented in the DAS‐ERECT system which is a sub‐system of the DAS project undertaken for the Daewoo Shipbuilding Company.

Date: 1994
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://doi.org/10.1002/j.1099-1174.1994.tb00060.x

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wly:isacfm:v:3:y:1994:i:2:p:111-125

Ordering information: This journal article can be ordered from
http://www.blackwell ... bs.asp?ref=1099-1174

Access Statistics for this article

More articles in Intelligent Systems in Accounting, Finance and Management from John Wiley & Sons, Ltd.
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-20
Handle: RePEc:wly:isacfm:v:3:y:1994:i:2:p:111-125