Progress and Regress of Time Dependent Data and Application in Bank Branch
F. Hosseinzadeh Lotfi,
Z. Taeb and
S. Abbasbandy
Journal of Applied Mathematics, 2014, vol. 2014, issue 1
Abstract:
To evaluate each decision making unit having time dependent inputs and outputs data, a new method has been developed and reported here. This method uses the Malmquist productivity index, and is a very simple function based on Cubic Spline function to determine the progress and regress of that unit. To show the capability of this developed method, the data of 9 branches of a commercial bank has been used, evaluated, and reported.
Date: 2014
References: Add references at CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1155/2014/703969
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:jnljam:v:2014:y:2014:i:1:n:703969
Access Statistics for this article
More articles in Journal of Applied Mathematics from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().