EconPapers    
Economics at your fingertips  
 

Progress and Regress of Time Dependent Data and Application in Bank Branch

F. Hosseinzadeh Lotfi, Z. Taeb and S. Abbasbandy

Journal of Applied Mathematics, 2014, vol. 2014, issue 1

Abstract: To evaluate each decision making unit having time dependent inputs and outputs data, a new method has been developed and reported here. This method uses the Malmquist productivity index, and is a very simple function based on Cubic Spline function to determine the progress and regress of that unit. To show the capability of this developed method, the data of 9 branches of a commercial bank has been used, evaluated, and reported.

Date: 2014
References: Add references at CitEc
Citations:

Downloads: (external link)
https://doi.org/10.1155/2014/703969

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wly:jnljam:v:2014:y:2014:i:1:n:703969

Access Statistics for this article

More articles in Journal of Applied Mathematics from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-22
Handle: RePEc:wly:jnljam:v:2014:y:2014:i:1:n:703969