Generation Expansion Models including Technical Constraints and Demand Uncertainty
P. Deossa,
K. De Vos,
G. Deconinck and
J. Espinosa
Journal of Applied Mathematics, 2017, vol. 2017, issue 1
Abstract:
This article presents a Generation Expansion Model of the power system taking into account the operational constraints and the uncertainty of long‐term electricity demand projections. The model is based on a discretization of the load duration curve and explicitly considers that power plant ramping capabilities must meet demand variations. A model predictive control method is used to improve the long‐term planning decisions while considering the uncertainty of demand projections. The model presented in this paper allows integrating technical constraints and uncertainty in the simulations, improving the accuracy of the results, while maintaining feasible computational time. Results are tested over three scenarios based on load data of an energy retailer in Colombia.
Date: 2017
References: Add references at CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1155/2017/3424129
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:jnljam:v:2017:y:2017:i:1:n:3424129
Access Statistics for this article
More articles in Journal of Applied Mathematics from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().