Electric load management in developing countries
Alberto J. Sabadell and
Alain Streicher
Natural Resources Forum, 1991, vol. 15, issue 2, 154-161
Abstract:
Energy planners in developing countries have traditionally sought to meet their nations' growing electricity demands by adding more generation and transmission capacity. But as the foreign investment situation became critical in the 1980s, private investment and system efficiency improvement programmes began to garner interest. One of the most promising system efficiency improvement options is load management, which uses a variety of techniques to utilize the electricity system's existing capacity more efficiently. However, to date, only three countries have seriously considered implementing large load management programmes: Pakistan, Peru and Costa Rica. This paper describes a 1987‐89 load control demonstration programme in Costa Rica, sponsored by the US Agency for International Development (AID), in which participating industries were able to reduce their peak demand by 14%.
Date: 1991
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1111/j.1477-8947.1991.tb00126.x
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:natres:v:15:y:1991:i:2:p:154-161
Access Statistics for this article
More articles in Natural Resources Forum from Blackwell Publishing
Bibliographic data for series maintained by Wiley Content Delivery ().