Optimal scheduling of objects in circulating systems
Donald R. Wridman
Naval Research Logistics Quarterly, 1967, vol. 14, issue 4, 559-568
Abstract:
A “circulating system” is a finite collection of objects, each of which is oscillaling between two states. The prototype system is that of ships on patrcl,each subject to a quasi‐regular “duty‐service” cycle. There are various restrictions on the time spent in either state by an object and on the number of objects in a state at any one time. Schedules are sought in which the total number in one state is as large and as constant as possible. The maximal average number in one state is calculated, and a necessary and sufficient condition is given for a schedule to achieve it. Procedures are developed for constructing a schedule which achieves the maximal average in the most constant manner.
Date: 1967
References: Add references at CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1002/nav.3800140410
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navlog:v:14:y:1967:i:4:p:559-568
Access Statistics for this article
More articles in Naval Research Logistics Quarterly from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().