James H. Patterson

Naval Research Logistics Quarterly, 1973, vol. 20, issue 4, 767-784

Abstract: The applicability of critical path scheduling is limited by the inability of the algorithm to cope with conflicting resource demands. This paper is an assessment of the effectiveness of many of the heuristic extensions to the critical path method which resolve the conflicts that develop between the resources demanded by an activity and those available. These heuristic rules are evaluated on their ability to solve a large multiproject scheduling problem.

Date: 1973
References: Add references at CitEc
Citations: View citations in EconPapers (3)

Downloads: (external link)
https://doi.org/10.1002/nav.3800200415

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wly:navlog:v:20:y:1973:i:4:p:767-784

Access Statistics for this article

More articles in Naval Research Logistics Quarterly from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-20
Handle: RePEc:wly:navlog:v:20:y:1973:i:4:p:767-784