The development and evaluation of a cost‐based composite scheduling rule
Sumer C. Aggarwal and
Bruce McCarl
Naval Research Logistics Quarterly, 1974, vol. 21, issue 1, 155-169
Abstract:
A cost‐based composite scheduling rule is developed and evaluated in comparison with three other well‐researched scheduling rules—SPT, S/OPN, and SST. This cost rule permits the optimization of more than one performance measure at a time. The priority number that is used for scheduling operations through each machine group is based on four separate performance measures—(1) In‐process Inventory, (2) Facilities Utilization, (3) Lateness, and (4) Mean Setup Time. The factorial experimental design involved three factor levels of loads, three factor levels of cost, and three factor levels of mean time. Analysis of variance was performed on each of the five output measures to study the effects of each of the three factors on each individual rule. Rank‐order comparisons between rules were also made; and, finally, general conclusions with regard to the effectiveness and flexibility of the Cost Rule were drawn.
Date: 1974
References: Add references at CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1002/nav.3800210111
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navlog:v:21:y:1974:i:1:p:155-169
Access Statistics for this article
More articles in Naval Research Logistics Quarterly from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().