Scheduling to minimize the weighted sum of completion times with secondary criteria
Richard N. Burns
Naval Research Logistics Quarterly, 1976, vol. 23, issue 1, 125-129
Abstract:
A result of Smith previously published in this journal [3], on the use of secondary criteria in scheduling problems, is shown to be incorrect and a counter example is presented. Heck and Roberts [2] suggested that their paper would be extended in the same way Smith's algorithm was. A new algorithm is given that converges to a local optimum for both problems.
Date: 1976
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://doi.org/10.1002/nav.3800230111
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navlog:v:23:y:1976:i:1:p:125-129
Access Statistics for this article
More articles in Naval Research Logistics Quarterly from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().