A modified block replacement policy
Menachem Berg and
Benjamin Epstein
Naval Research Logistics Quarterly, 1976, vol. 23, issue 1, 15-24
Abstract:
A well known preventive replacement policy is the block replacement policy (BRP). In such a policy the item undergoes a planned replacement at a sequence of equally spaced time points independent of failure history. The main advantage of a BRP is its simplicity, because under this policy it is unnecessary to keep detailed records about times of failures or ages of items. The main drawback of a BRP is that at planned replacement times we may be replacing practically new items. In this paper we study a modified BRP which is free of this drawback. We calculate the expected cost of following a modified BRP for lifetime distributions possessing a special structure and illustrate it for the case of an Erlang distribution. A numerical comparison is made between a modified BRP and a standard BRP for the special case of a two stage Erlang distribution.
Date: 1976
References: Add references at CitEc
Citations: View citations in EconPapers (4)
Downloads: (external link)
https://doi.org/10.1002/nav.3800230103
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navlog:v:23:y:1976:i:1:p:15-24
Access Statistics for this article
More articles in Naval Research Logistics Quarterly from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().