Sequencing independent jobs with a single resource
Kenneth R. Baker and
Henry L. W. Nuttle
Naval Research Logistics Quarterly, 1980, vol. 27, issue 3, 499-510
Abstract:
This paper examines problems of sequencing n jobs for processing by a single resource to minimize a function of job completion times, when the availability of the resource varies over time. A number of well‐known results for single‐machine problems which can be applied with little or no modification to the corresponding variable‐resource problems are given. However, it is shown that the problem of minimizing the weighted sum of completion times provides an exception.
Date: 1980
References: Add references at CitEc
Citations: View citations in EconPapers (4)
Downloads: (external link)
https://doi.org/10.1002/nav.3800270313
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navlog:v:27:y:1980:i:3:p:499-510
Access Statistics for this article
More articles in Naval Research Logistics Quarterly from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().