A replacement schedule for multicomponent life‐limited parts
Sheldon Epstein and
Yonah Wilamowsky
Naval Research Logistics Quarterly, 1982, vol. 29, issue 4, 685-692
Abstract:
In previous papers [1], [2] the authors developed a maintenance policy for a single life‐limited part. Using an opportunistic replacement approach a scheme was devised which utilized early replacement of equipment to offset more costly future expenditures. This paper will extend the results to the multicomponent case. Examples are given illustrating the benefits of this new technique.
Date: 1982
References: Add references at CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1002/nav.3800290415
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navlog:v:29:y:1982:i:4:p:685-692
Access Statistics for this article
More articles in Naval Research Logistics Quarterly from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().