Multiple resource leveling in construction systems through variation of activity intensities
Robert C. Leachman
Naval Research Logistics Quarterly, 1983, vol. 30, issue 2, 187-198
Abstract:
The resource leveling problem for a construction system producing a stream of output units is considered. The system is modeled using a critical‐path‐analysis activity network, from which an extended network is developed for an integrated planning effort of all output units. Activity intensity variables are defined which measure activity demand rates for resources and consequent activity durations for the production of each output unit. A heuristic approach consisting of an iterative nonlinear programming procedure is presented which computes activity durations (intensities) for the minimization of resource capacity costs subject to meeting construction due dates. The application to a major ship overhaul project is described, in which the procedure was used to level workloads of the various labor–trade shops.
Date: 1983
References: Add references at CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1002/nav.3800300202
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navlog:v:30:y:1983:i:2:p:187-198
Access Statistics for this article
More articles in Naval Research Logistics Quarterly from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().