Some studies on shuttle and assembly‐line processes
M. Pollack
Naval Research Logistics Quarterly, 1958, vol. 5, issue 2, 125-136
Abstract:
Two types of flow processes are described and formulated, a shuttle and an assembly‐line process. Variations ofeachare studied for the general N‐stage condition. The shuttle process is considered for multiple shuttles per stage and the combination of multiple shuttles per stage with storage capacity at the nodes. The assembly‐line process is considered for multiple machines per stage, both with and without setup times included. The mathematical method of recurrence relations is used to formulate these relations for the various delay and arrival times of the items in each process. It is demonstrated that certain types of shuttle and assembly‐line processes are completely analogous. All known solutions of one process may then be applied to the other.
Date: 1958
References: Add references at CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1002/nav.3800050205
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navlog:v:5:y:1958:i:2:p:125-136
Access Statistics for this article
More articles in Naval Research Logistics Quarterly from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().