EconPapers    
Economics at your fingertips  
 

Budget constraints in logistics models

G. Hadley and T. M. Whitin

Naval Research Logistics Quarterly, 1961, vol. 8, issue 3, 215-220

Abstract: In application of operations research models in the area of logistics, important constraints are typically encountered in the form of limitations on the funds appropriated. A supply system must be operated within whatever budgeted funds are appropriated by Congress. In the present article, various possible types of budget constraints are discussed as well as their impact on certain types of operations research models. The possible misallocations that can result from the setting of specific budgets designated for particular purposes are discussed. The confusion existing in the literature concerning the type of constraints that are actually encountered versus those that are imposed upon the mathematical models is pointed out as well as the typical inconsistency of budget constraints and steady‐state models. The difference between a steady‐state budget and a transition‐phase budget is clarified.

Date: 1961
References: Add references at CitEc
Citations:

Downloads: (external link)
https://doi.org/10.1002/nav.3800080303

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wly:navlog:v:8:y:1961:i:3:p:215-220

Access Statistics for this article

More articles in Naval Research Logistics Quarterly from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-20
Handle: RePEc:wly:navlog:v:8:y:1961:i:3:p:215-220