Minimizing absolute and squared deviations of completion times with different earliness and tardiness penalties and a common due date
Uttarayan Bagchi,
Yih‐Long Chang and
Robert S. Sullivan
Naval Research Logistics (NRL), 1987, vol. 34, issue 5, 739-751
Abstract:
We consider a single‐machine scheduling problem in which all jobs have the same due date and penalties are assessed for both early and late completion of jobs. However, earliness and tardiness are penalized at different rates. The scheduling objective is to minimize either the weighted sum of absolute deviations (WSAD) or the weighted sum of squared deviations (WSSD). For each objective we consider two versions of the problem. In the unconstrained version an increase in the due date does not yield any further decrease in the objective function. We present a constructive algorithm for the unconstrained WSAD problem and show that this problem is equivalent to the two‐parallel, nonidentical machine, mean flow‐time problem. For the unconstrained WSSD and the constrained WSAD and WSSD problems we propose implicit enumeration procedures based on several dominance conditions. We also report on our computational experience with the enumeration procedures.
Date: 1987
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (24)
Downloads: (external link)
https://doi.org/10.1002/1520-6750(198710)34:53.0.CO;2-3
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:34:y:1987:i:5:p:739-751
Access Statistics for this article
More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().