EconPapers    
Economics at your fingertips  
 

Variance of the number of units produced on a transfer line with buffer inventories during a period of length T

G. J. Miltenburg

Naval Research Logistics (NRL), 1987, vol. 34, issue 6, 811-822

Abstract: The transfer‐line models in the literature are planning models rather than operational models. That is, they are very useful for planning or designing the transfer line, but are less useful for controlling the daily operation of the line. The performance measure used in these models is the efficiency of the line A. The expected number of units produced during a period of length T cycles is AT. In this article a procedure is presented for calculating the variance of the number of units produced by the transfer line during a period of length T cycles. These two performance measures can be used to construct an interval estimate for, say, the number of units produced during a shift. This interval estimate is an operational guide for the production manager.

Date: 1987
References: View complete reference list from CitEc
Citations: View citations in EconPapers (6)

Downloads: (external link)
https://doi.org/10.1002/1520-6750(198712)34:63.0.CO;2-Z

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:34:y:1987:i:6:p:811-822

Access Statistics for this article

More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-20
Handle: RePEc:wly:navres:v:34:y:1987:i:6:p:811-822