Analysis of project scheduling strategies in a client‐contractor environment
Joshua B. Levy and
Giri Kumar Tayi
Naval Research Logistics (NRL), 1989, vol. 36, issue 1, 69-87
Abstract:
In this article we consider a cost‐minimization model to investigate scheduling strategies for multistaged projects in a client‐contractor environment. This type of environment is symptomatic of temporal changes in project definition and scope. At prespecified epochs the client conducts an external evaluation of the project and either accepts or rejects the contractor's current work. The resulting uncertainty from the client's review is modeled via monotonically varying acceptance probabilities. The model is designed primarily to address the interaction between earliest‐, intermediate‐, and latest‐start options and project‐crashing stragies for a broad range of penalty costs. Theoretical results are introduced, while numerical examples for both exponentially and polynomially based acceptance probabilities are discussed.
Date: 1989
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1002/1520-6750(198902)36:13.0.CO;2-E
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:36:y:1989:i:1:p:69-87
Access Statistics for this article
More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().