Interrelationships between performance measures for the machine‐repairman problem
Saligrama R. Agnihothri
Naval Research Logistics (NRL), 1989, vol. 36, issue 3, 265-271
Abstract:
The machine‐repairman problem with heterogeneous machines and multiple repairmen is considered. It is assumed that machine up times and repair times have general distributions, and a work‐conserving service discipline is employed. Under these general assumptions, steady‐state relationships between performance measures are examined for the individual machines. Also, various performance measures are defined for the aggregate system and interrelationships between these measures are established.
Date: 1989
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1002/1520-6750(198906)36:33.0.CO;2-F
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:36:y:1989:i:3:p:265-271
Access Statistics for this article
More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().