EconPapers    
Economics at your fingertips  
 

Single‐machine scheduling subject to stochastic breakdowns

John Birge, J. B. G. Frenk, J. Mittenthal and A. H. G. Rinnooy Kan

Naval Research Logistics (NRL), 1990, vol. 37, issue 5, 661-677

Abstract: We provide several examples of one‐machine problems in which the minimization of expected cost subject to stochastic breakdowns of the machine can be successfully attacked analytically. In particular for the weighted flow‐time model, we derive strong bounds on the difference between the optimal static policy and the WSPT policy and discuss an example in which the WSPT policy is not optimal.

Date: 1990
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (11)

Downloads: (external link)
https://doi.org/10.1002/1520-6750(199010)37:53.0.CO;2-3

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:37:y:1990:i:5:p:661-677

Access Statistics for this article

More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-20
Handle: RePEc:wly:navres:v:37:y:1990:i:5:p:661-677