EconPapers    
Economics at your fingertips  
 

Unbalanced production line scheduling with partial job specialization

Wafik H. Iskander and Jar Chou

Naval Research Logistics (NRL), 1990, vol. 37, issue 5, 789-805

Abstract: This article presents a mathematical model for manpower scheduling for unbalanced production lines in order to minimize in‐process inventory cost. The model extends prior work by adding workers' skill limitations to the system. The model is formulated for a one‐period schedule and then extended for multiperiod schedules. An example problem is solved for both single and multiperiods. A heuristic algorithm is also presented for multiperiod and large‐scale problems, and computational experiences are reported.

Date: 1990
References: View complete reference list from CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
https://doi.org/10.1002/1520-6750(199010)37:53.0.CO;2-R

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:37:y:1990:i:5:p:789-805

Access Statistics for this article

More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-20
Handle: RePEc:wly:navres:v:37:y:1990:i:5:p:789-805