Parallel machine replacement
Philip C. Jones,
James L. Zydiak and
Wallace J. Hopp
Naval Research Logistics (NRL), 1991, vol. 38, issue 3, 351-365
Abstract:
We consider the parallel replacement problem in which there are both fixed and variable costs associated with replacing machines. Increasing maintenance costs motivate replacements, and the fixed replacement cost provides incentive for replacing machines of different ages together in “clusters.” We prove two intuitive results for this problem. First, it is never optimal to split a cluster of like‐aged machines, and second, it is never optimal to replace newer clusters before older clusters. By incorporating these two results into an algorithmic approach, we vastly reduce the amount of computation required to identify an optimal replacement policy.
Date: 1991
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (10)
Downloads: (external link)
https://doi.org/10.1002/1520-6750(199106)38:33.0.CO;2-U
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:38:y:1991:i:3:p:351-365
Access Statistics for this article
More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().