A stochastic machine maintenance and sale problem: Results with different production functions
Mark G. Tang
Naval Research Logistics (NRL), 1993, vol. 40, issue 5, 677-696
Abstract:
In this article we solve and analyze a stochastic version of the Boiteux problem by employing the stochastic optimal control method. Our setup is close to that of Thompson [22]. Our focus is to analyze, under the same structure, how different production functions and how the variance in machine deterioration/maintenance affect our optimal machine maintenance and sale date decisions. © 1993 John Wiley & Sons, Inc.
Date: 1993
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1002/1520-6750(199308)40:53.0.CO;2-3
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:40:y:1993:i:5:p:677-696
Access Statistics for this article
More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().