EconPapers    
Economics at your fingertips  
 

Supply management in assembly systems

Chengbin Chu, Jean‐Marie Proth and Xiaolan Xie

Naval Research Logistics (NRL), 1993, vol. 40, issue 7, 933-949

Abstract: We consider the case when n components are needed to assemble a given product. Components are provided by suppliers, and the period between the order time and the time a component is available (i.e., the lead time) is a random variable with a known distribution. The due date for the assembled product is also known. The costs to be taken into account are the inventory costs of the components and the backlogging cost of the assembled product. We propose an iterative algorithm which leads to the optimal order instants of the components. © 1993 John Wiley & Sons, Inc.

Date: 1993
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (6)

Downloads: (external link)
https://doi.org/10.1002/1520-6750(199312)40:73.0.CO;2-8

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:40:y:1993:i:7:p:933-949

Access Statistics for this article

More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-20
Handle: RePEc:wly:navres:v:40:y:1993:i:7:p:933-949