Scheduling on M parallel machines subject to random breakdowns to minimize expected mean flow time
Ali Allahverdi and
John Mittenthal
Naval Research Logistics (NRL), 1994, vol. 41, issue 5, 677-682
Abstract:
The problem of scheduling n jobs on m parallel machines is considered when the machines are subject to random breakdowns and job processing times are random variables. An objective function of mean flow time is developed for a general parallel machine system, and an expression of its expected value is derived. The problem is transformed into a deterministic unrelated parallel machine scheduling model with modified processing times when the number of breakdowns is modeled as a generalized Poisson process. © 1994 John Wiley & Sons, Inc.
Date: 1994
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
https://doi.org/10.1002/1520-6750(199408)41:53.0.CO;2-7
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:41:y:1994:i:5:p:677-682
Access Statistics for this article
More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().