Optimal timing schedules in earliness‐tardiness single machine sequencing
Wlodzimierz Szwarc and
Samar K. Mukhopadhyay
Naval Research Logistics (NRL), 1995, vol. 42, issue 7, 1109-1114
Abstract:
The article deals with a single machine earliness‐tardiness scheduling model where idle times are permitted in job processing. Based on a cluster concept we develop properties of the model that lead to a very fast algorithm to find an optimal timing schedule for a given sequence of jobs. The performance of this algorithm is tested on 480 randomly generated problems involving 100, 200, 400 and 500 jobs. It takes less than two seconds to solve a 500 job problem on a PC. © 1995 John Wiley & Sons, Inc.
Date: 1995
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
https://doi.org/10.1002/1520-6750(199510)42:73.0.CO;2-5
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:42:y:1995:i:7:p:1109-1114
Access Statistics for this article
More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().