Sequencing with setup time and order tardiness trade‐offs
Ching‐Jong Liao and
Cheng‐Hsing Chuang
Naval Research Logistics (NRL), 1996, vol. 43, issue 7, 971-984
Abstract:
We consider the problem of scheduling customer orders on a single facility where each order consists of several jobs that can be clustered into several groups. When a facility is changed over to another group, a setup time associated with the new group is required. Two particular problems are considered in this context. One is to consider the total setup time and the number of tardy orders jointly. The other is to consider the total setup time and the maximum tardiness jointly. The total setup time in both problems represents a measure of internal efficiency, whereas the number of tardy orders and the maximum tardiness represent a measure of external efficiency. In any shop, the decision maker must consider the tradeoffs between large setup costs associated with a more frequent changeover schedule versus the cost of tardy orders that might be induced by a less‐frequent changeover schedule. In this article branch‐and‐bound algorithms are proposed to identify the set of nondominated schedules for the two bicriteria problems. © 1996 John Wiley & Sons, Inc.
Date: 1996
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://doi.org/10.1002/(SICI)1520-6750(199610)43:73.0.CO;2-A
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:43:y:1996:i:7:p:971-984
Access Statistics for this article
More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().