EconPapers    
Economics at your fingertips  
 

Scheduling to minimize the total compression and late costs

T.C.E. Cheng, Zhi‐Long Chen, Chung‐Lun Li and B.M.‐T. Lin

Naval Research Logistics (NRL), 1998, vol. 45, issue 1, 67-82

Abstract: We consider a single‐machine scheduling model in which the job processing times are controllable variables with linear costs. The objective is to minimize the sum of the cost incurred in compressing job processing times and the cost associated with the number of late jobs. The problem is shown to be NP‐hard even when the due dates of all jobs are identical. We present a dynamic programming solution algorithm and a fully polynomial approximation scheme for the problem. Several efficient heuristics are proposed for solving the problem. Computational experiments demonstrate that the heuristics are capable of producing near‐optimal solutions quickly. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 67–82, 1998

Date: 1998
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (4)

Downloads: (external link)
https://doi.org/10.1002/(SICI)1520-6750(199802)45:13.0.CO;2-J

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:45:y:1998:i:1:p:67-82

Access Statistics for this article

More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-20
Handle: RePEc:wly:navres:v:45:y:1998:i:1:p:67-82