Heuristics for multicomponent joint replacement: Applications to aircraft engine maintenance
Wallace J. Hopp and
Yar‐Lin Kuo
Naval Research Logistics (NRL), 1998, vol. 45, issue 5, 435-458
Abstract:
This paper considers the maintenance of aircraft engine components where economies exist for joint replacement because (a) the aircraft must be pulled from service for maintenance and (b) repair of some components requires removal and disassembly of the engine. It is well known that the joint replacement problem is difficult to solve exactly, because the optimal solution does not have a simple structured form. Therefore, we formulate three easy‐to‐implement heuristics and test their performance against a lower bound for various numerical examples. One of our heuristics, the base interval approach, in which replacement cycles for all components are restricted to be multiples of a specified interval, is shown to be robustly accurate. Moreover, this heuristic is consistent with maintenance policies used by commercial airlines in which periodic maintenance checks are made at regular intervals. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 435–458, 1998
Date: 1998
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1002/(SICI)1520-6750(199808)45:53.0.CO;2-4
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:45:y:1998:i:5:p:435-458
Access Statistics for this article
More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().