EconPapers    
Economics at your fingertips  
 

Heuristic procedures for scheduling job families with setups and due dates

Kenneth R. Baker

Naval Research Logistics (NRL), 1999, vol. 46, issue 8, 978-991

Abstract: This paper examines heuristic solution procedures for scheduling jobs on a single machine to minimize the maximum lateness in the presence of setup times between different job families. It reviews the state of knowledge about the solution of this problem, which is known to be difficult to solve in general, and examines natural solution approaches derived from some of the underlying theory. The emphasis is on the design and computational evaluation of new heuristic procedures. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 978–991, 1999

Date: 1999
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://doi.org/10.1002/(SICI)1520-6750(199912)46:83.0.CO;2-D

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:46:y:1999:i:8:p:978-991

Access Statistics for this article

More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-20
Handle: RePEc:wly:navres:v:46:y:1999:i:8:p:978-991