Project scheduling under competition
Igor Averbakh and
Vasilij Lebedev
Naval Research Logistics (NRL), 2005, vol. 52, issue 6, 481-492
Abstract:
We introduce and investigate the problem of scheduling activities of a project by a firm that competes with another firm (the competitor) that has to perform the same project. The profit that the firm gets from each activity depends on whether the firm finishes the activity before or after its competitor. The objective is to maximize the guaranteed (worst‐case) profit. We assume that both the firm and the competitor can perform only one activity at a time. We perform a detailed complexity analysis of the problem, and consider problems with and without precedence constraints, with and without delay of the competitor, with general and equal processing times of activities. For polynomially solvable cases (which include, for example, all the considered problems without delay of the competitor), we present easily implementable and intuitive rules that allow us to obtain optimal schedules in linear or almost linear time. For some NP‐hard cases, we present pseudopolynomial algorithms and fast heuristics with worst‐case approximation guarantees. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.
Date: 2005
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1002/nav.20091
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:52:y:2005:i:6:p:481-492
Access Statistics for this article
More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().