Scheduling and due‐date quotation in a make‐to‐order supply chain
Philip Kaminsky and
Onur Kaya
Naval Research Logistics (NRL), 2008, vol. 55, issue 5, 444-458
Abstract:
We consider a manufacturer, served by a single supplier, who has to quote due dates to arriving customers in a make‐to‐order production environment. The manufacturer is penalized for long lead times and for missing due dates. To meet due dates, the manufacturer has to obtain components from a supplier. We model this manufacturer and supplier as a two‐machine flow shop, consider several variations of this problem, and design effective due‐date quotation and scheduling algorithms for centralized and decentralized versions of the model. We perform extensive computational testing to assess the effectiveness of our algorithms and to compare the centralized and decentralized models to quantify the value of centralized control in a make‐to‐order supply chain. Since complete information exchange and centralized control is not always practical or cost‐effective, we explore the value of partial information exchange for this system. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008
Date: 2008
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
https://doi.org/10.1002/nav.20297
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:55:y:2008:i:5:p:444-458
Access Statistics for this article
More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().