Scheduling a maintenance activity on parallel identical machines
Asaf Levin,
Gur Mosheiov and
Assaf Sarig
Naval Research Logistics (NRL), 2009, vol. 56, issue 1, 33-41
Abstract:
We study a problem of scheduling a maintenance activity on parallel identical machines, under the assumption that all the machines must be maintained simultaneously. One example for this setting is a situation where the entire system must be stopped for maintenance because of a required electricity shut‐down. The objective is minimum flow‐time. The problem is shown to be NP‐hard, and moreover impossible to approximate unless P = NP. We introduce a pseudo‐polynomial dynamic programming algorithm, and show how to convert it into a bicriteria FPTAS for this problem. We also present an efficient heuristic and a lower bound. Our numerical tests indicate that the heuristic provides in most cases very close‐to‐optimal schedules. © 2008 Wiley Periodicals, Inc. Naval Research Logistics 2009
Date: 2009
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1002/nav.20324
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:56:y:2009:i:1:p:33-41
Access Statistics for this article
More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().