Cyclic scheduling in robotic flowshops with bounded work‐in‐process levels
Ada Che,
Vladimir Kats and
Eugene Levner
Naval Research Logistics (NRL), 2011, vol. 58, issue 1, 1-16
Abstract:
This study addresses cyclic scheduling in robotic flowshops with bounded work‐in‐process (WIP) levels. The objective is to minimize the cycle time or, equivalently, to maximize the throughput, under the condition that the WIP level is bounded from above by a given integer number. We present several strongly polynomial algorithms for the 2‐cyclic robotic flowshop scheduling problems for various WIP levels. © 2010 Wiley Periodicals, Inc. Naval Research Logistics 58: 1–16, 2011
Date: 2011
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1002/nav.20435
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:58:y:2011:i:1:p:1-16
Access Statistics for this article
More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().