EconPapers    
Economics at your fingertips  
 

Cyclic scheduling in robotic flowshops with bounded work‐in‐process levels

Ada Che, Vladimir Kats and Eugene Levner

Naval Research Logistics (NRL), 2011, vol. 58, issue 1, 1-16

Abstract: This study addresses cyclic scheduling in robotic flowshops with bounded work‐in‐process (WIP) levels. The objective is to minimize the cycle time or, equivalently, to maximize the throughput, under the condition that the WIP level is bounded from above by a given integer number. We present several strongly polynomial algorithms for the 2‐cyclic robotic flowshop scheduling problems for various WIP levels. © 2010 Wiley Periodicals, Inc. Naval Research Logistics 58: 1–16, 2011

Date: 2011
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://doi.org/10.1002/nav.20435

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:58:y:2011:i:1:p:1-16

Access Statistics for this article

More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-20
Handle: RePEc:wly:navres:v:58:y:2011:i:1:p:1-16