EconPapers    
Economics at your fingertips  
 

Operations sequencing for a multi‐stage production inventory system

Jim (Junmin) Shi, Xiaohang Yue and Yao Zhao

Naval Research Logistics (NRL), 2014, vol. 61, issue 2, 144-154

Abstract: This article studies operations sequencing for a multi‐stage production inventory system with lead times under predictable (deterministic) yield losses and random demand. We consider various cases with either full or partial release of work‐in‐process inventories, for either pre‐operation or post‐operation cost structures, and under either the total discounted or average cost criteria. We derive necessary and sufficient criteria for the optimal sequence of operations in all cases. While the criteria differ in their specific forms, they all lead to the same principal: those operations with (1) lower yields, (2) lower processing costs, (3) longer lead times, and (4) lower inventory holding costs should be placed higher upstream in the system.Copyright © 2014 Wiley Periodicals, Inc. Naval Research Logistics 61: 144–154, 2014

Date: 2014
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
https://doi.org/10.1002/nav.21572

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:61:y:2014:i:2:p:144-154

Access Statistics for this article

More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-20
Handle: RePEc:wly:navres:v:61:y:2014:i:2:p:144-154