EconPapers    
Economics at your fingertips  
 

Proportionate flow shop: New complexity results and models with due date assignment

S.S. Panwalkar and Christos Koulamas

Naval Research Logistics (NRL), 2015, vol. 62, issue 2, 98-106

Abstract: It is known that the proportionate flow shop minimum makespan F m / p r p t / C max problem is solved optimally by any permutation job sequence. We show that the F m / p r p t / C max problem is at least ordinary NP‐hard when missing operations are allowed and present some solvable cases. We then consider the standard proportionate flow shop problem (with no missing operations) and show that the solution algorithms for a class of single‐machine due date assignment problems can be extended/generalized to the corresponding proportionate flow shop problems. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 98–106, 2015

Date: 2015
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)

Downloads: (external link)
https://doi.org/10.1002/nav.21615

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:62:y:2015:i:2:p:98-106

Access Statistics for this article

More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-20
Handle: RePEc:wly:navres:v:62:y:2015:i:2:p:98-106