Project management using point graphs
Mashood Ishaque,
Abbas K. Zaidi and
Alexander H. Levis
Systems Engineering, 2009, vol. 12, issue 1, 36-54
Abstract:
A graph‐based approach for scheduling and monitoring temporal events and activities in a system engineering project is presented. It attempts to overcome some of the limitations of traditional project management approaches by allowing specifications of real‐time milestones, and by breaking the finish‐start barrier between the activities. An example of a residential construction project is used to illustrate the approach. © 2008 Wiley Periodicals, Inc. Syst Eng
Date: 2009
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1002/sys.20107
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:syseng:v:12:y:2009:i:1:p:36-54
Access Statistics for this article
More articles in Systems Engineering from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().