EconPapers    
Economics at your fingertips  
 

Project schedule recomputation after risk inclusion

Muzaffar A. Shaikh

Systems Engineering, 1998, vol. 1, issue 3, 242-249

Abstract: In this paper, based on the assumption that the project schedule has already been calculated prior to risk impact, a statistical method is presented to recompute the expected schedule, its standard deviation, and 95% confidence for the true but unknown schedule. The confidence interval can serve to scientifically establish the upper and lower bounds for the schedule (and the cost) for use in, for example, the fee calculation of cost‐plus‐fixed‐fee type projects. Even though the discussion in this paper is limited to project schedule matters, the method can be applied to project cost recomputation as well. © 1998 John Wiley & Sons, Inc. Syst Eng 1: 242–249, 1998

Date: 1998
References: Add references at CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
https://doi.org/10.1002/(SICI)1520-6858(1998)1:33.0.CO;2-R

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wly:syseng:v:1:y:1998:i:3:p:242-249

Access Statistics for this article

More articles in Systems Engineering from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-20
Handle: RePEc:wly:syseng:v:1:y:1998:i:3:p:242-249