Project schedule recomputation after risk inclusion
Muzaffar A. Shaikh
Systems Engineering, 1998, vol. 1, issue 3, 242-249
Abstract:
In this paper, based on the assumption that the project schedule has already been calculated prior to risk impact, a statistical method is presented to recompute the expected schedule, its standard deviation, and 95% confidence for the true but unknown schedule. The confidence interval can serve to scientifically establish the upper and lower bounds for the schedule (and the cost) for use in, for example, the fee calculation of cost‐plus‐fixed‐fee type projects. Even though the discussion in this paper is limited to project schedule matters, the method can be applied to project cost recomputation as well. © 1998 John Wiley & Sons, Inc. Syst Eng 1: 242–249, 1998
Date: 1998
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://doi.org/10.1002/(SICI)1520-6858(1998)1:33.0.CO;2-R
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:syseng:v:1:y:1998:i:3:p:242-249
Access Statistics for this article
More articles in Systems Engineering from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().