Why projects often fail, even with high cost‐contingencies
Edouard Kujawski
Systems Engineering, 2002, vol. 5, issue 2, 151-155
Abstract:
In this note we assume that the individual risks have been adequately quantified and the total project cost contingency adequately computed to ensure an agreed‐to probability or confidence level that the total project cost estimate will not be exceeded. But even projects that implement such a process are likely to result in significant cost overruns and/or project failure if the project manager allocates the contingencies to the individual subsystems. The intuitive and mathematically valid solution is to maintain a project‐wide contingency and to distribute it to the individual risks on an as‐needed basis. Such an approach ensures cost‐efficient risk management, and projects that implement it are more likely to succeed and to cost less. We illustrate these ideas using a simplified project with two independent risks. The formulation can readily be extended to multiple risks. © 2002 Wiley Periodicals, Inc. Syst Eng 5: 151–155, 2002
Date: 2002
References: View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
https://doi.org/10.1002/sys.10006
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:syseng:v:5:y:2002:i:2:p:151-155
Access Statistics for this article
More articles in Systems Engineering from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().