A 4-DAY OR A 3-DAY WORKWEEKS SCHEDULING PROBLEM WITH A GIVEN WORKFORCE SIZE
Fethi Jarray ()
Additional contact information
Fethi Jarray: Gabes University of Sciences, Gabes 6072, Tunisia;
Asia-Pacific Journal of Operational Research (APJOR), 2009, vol. 26, issue 05, 685-696
Abstract:
This paper presents an exact decomposition approach for an employee days-off scheduling problem of an homogeneous workforce under serval realistic days-off scheduling constraints. These constraints include the following: (1) each employee is assigned to three or four consecutive days-off per week, (2) each employee is assigned at least four consecutive days-off per month and (3) each employee is assigned at least a weekend off per month. A three-step decomposition method is used to obtain the work assignments while respecting the labor demands and the stated constraints.
Keywords: Workforce scheduling; maximum flow; days-off scheduling (search for similar items in EconPapers)
Date: 2009
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://www.worldscientific.com/doi/abs/10.1142/S0217595909002419
Access to full text is restricted to subscribers
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wsi:apjorx:v:26:y:2009:i:05:n:s0217595909002419
Ordering information: This journal article can be ordered from
DOI: 10.1142/S0217595909002419
Access Statistics for this article
Asia-Pacific Journal of Operational Research (APJOR) is currently edited by Gongyun Zhao
More articles in Asia-Pacific Journal of Operational Research (APJOR) from World Scientific Publishing Co. Pte. Ltd.
Bibliographic data for series maintained by Tai Tone Lim ().