Practical Framework to Facilitate Constructability Implementation Using Building Information Modeling Approach: A Case Study

Rozita Samimpey and Ehsan Saghatforoush
Additional contact information
Rozita Samimpey: Department of Project and Construction Management, Mehralborz University, Tehran - Iran
Ehsan Saghatforoush: ��School of Construction Economics and Management, University of the Witwatersrand, Johannesburg, South Africa

International Journal of Innovation and Technology Management (IJITM), 2024, vol. 21, issue 01, 1-30

Abstract: Constructability has always been the focus of many construction firms, to bring the construction knowledge and experience into the early project phases of planning and design. However, there have always been different ideas on how to perform it in the best way and to avoid lack of knowledge of project components and constructability concept, poor coordination among project team members, and wrong estimation of time and cost result in duplications and project wastes. Improper use of multidimensional modelings in the construction process, negatively affects the success of projects. The use of new technologies has enhanced the constructability implementation. This research provides a practical framework to apply the benefits of Building Information Modeling (BIM) to fulfill the prerequisites for constructability implementation. This framework reduces project wastes and prevents errors, delays, duplications, and thus reduces project time and cost. Using BIM, all project practitioners are present from the beginning of the project, and the needs of each member and project goals are identified. A powerful database is developed to access project data at any time, which can be effective in making critical decisions. In this way, it can facilitate constructability processes. According to the existing literature reviews and the results obtained from the interviews, this study has developed a practical framework that provides some solutions to effectively meet constructability prerequisites. This is important because many of the problems of construction infrastructure projects are due to insufficient communication, lack of integration, lack of familiarity with new technologies, duplications, and lack of attention to constructability of projects.

Keywords: Text constructability; construction projects; building information modeling (BIM); duplications; framework (search for similar items in EconPapers)
Date: 2024
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.worldscientific.com/doi/abs/10.1142/S0219877024500044
Access to full text is restricted to subscribers

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wsi:ijitmx:v:21:y:2024:i:01:n:s0219877024500044

Ordering information: This journal article can be ordered from

DOI: 10.1142/S0219877024500044

Access Statistics for this article

International Journal of Innovation and Technology Management (IJITM) is currently edited by H K Tang

More articles in International Journal of Innovation and Technology Management (IJITM) from World Scientific Publishing Co. Pte. Ltd.
Bibliographic data for series maintained by Tai Tone Lim ().

 
Page updated 2025-03-20
Handle: RePEc:wsi:ijitmx:v:21:y:2024:i:01:n:s0219877024500044