EconPapers    
Economics at your fingertips  
 

The critical chain method in project management – a formal description

Dorota Kuchta

Operations Research and Decisions, 2004, vol. 14, issue 1, 37-51

Abstract: The critical chain method is a recent alternative to the traditional critical path method, an alternative which is becoming more and more popular, but still lacks a formal description. It exists more or less on the level of ideas and seems to have quite a lot of gaps and non-researched areas. This paper constitutes an attempt to create a formal description of the method, trying and the same time to fill in some of the gaps and to indicate a further need for OR research.

Keywords: project management and scheduling; risk management; critical path; critical chaim (search for similar items in EconPapers)
Date: 2004
References: View complete reference list from CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
https://ord.pwr.edu.pl/assets/papers_archive/7%20-%20published.pdf (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wut:journl:v:1:y:2004:p:37-51

Access Statistics for this article

More articles in Operations Research and Decisions from Wroclaw University of Science and Technology, Faculty of Management Contact information at EDIRC.
Bibliographic data for series maintained by Adam Kasperski ().

 
Page updated 2025-03-20
Handle: RePEc:wut:journl:v:1:y:2004:p:37-51