Tomislav Gelo Željko Vrban Dalibor Pudić: Faculty of Economics and Business, University of Zagreb, Zagreb, Croatia. Croatian Energy Regulatory Agency, Zagreb, Croatia. Croatian Energy Regulatory Agency, Zagreb, Croatia.

Zagreb International Review of Economics and Business, 2019, vol. 22, issue SCI2, 73-91

Abstract: The energy sector is characterized by market and monopoly activities. Monopoly activities include network activities, transmission and distribution of electricity, and transport and distribution of natural gas. For this reason, the revenue of the network activities is defined as allowed income, and it is under the control of the national energy regulator. In Croatia, this is the Croatian Energy Regulatory Agency. The allowed revenues of the network system operator in the Croatian energy sector are defined by the methodologies for individual network activities, which are based on the method of eligible costs. Network activities are usually capital-intensive activities. Capital cost is an element of the eligible cost method and is accounted for as a weighted average cost of capital (WACC). WACC affects the allowed revenue of the network system operator and the network tariff. It depends on the interest rates on debt capital, the risk-free rate, the market risk premium and the corporate tax rate. Changing the interest rate on the capital market, which also depends on the credit risk of the country, affects both the change in WACC and the change of tariffs for transport / transmission of energy. Amortization and operating expenses of the network operator, approved by the energy regulator, also have a significant impact on allowed revenues. The impact of the WACC change on the allowed revenue and network tariffs of network system operators has a different impact on the network tariffs, which depends on the structure of the eligible costs of a particular network system operator. Changing WACC affects the changes in tariffs of the network system operator. The aim of the paper is to determine how an interest rate change affects the WACC and how the change in WACC affects the change in the allowed revenue and the network tariff of the gas transport operator and the transmission of electricity in Croatia. The paper will analyse the tariffs of electricity transmission and natural gas transport in Croatia and compare them with those in the European Union. JEL Classification: D42, G32, L51

Keywords: WACC; interest rate; network system operator; allowed revenue; network tariff (search for similar items in EconPapers)
Date: 2019
References: Add references at CitEc
Citations:

Downloads: (external link)
https://hrcak.srce.hr/index.php?show=clanak&id_clanak_jezik=339979 (text/html)
Abstract only available on-line

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:zag:zirebs:v:22:y:2019:i:sci2:p:73-91

Ordering information: This journal article can be ordered from
Zagreb International Review of Economics and Business, Faculty of Economics and Business, Trg J. F. Kennedy 6, 10000 Zagreb, Croatia.
http://www.efzg.hr/default.aspx?id=6045

Access Statistics for this article

Zagreb International Review of Economics and Business is currently edited by Soumitra Sharma

More articles in Zagreb International Review of Economics and Business from Faculty of Economics and Business, University of Zagreb Contact information at EDIRC.
Bibliographic data for series maintained by Jurica Šimurina ( this e-mail address is bad, please contact ).

 
Page updated 2024-12-29
Handle: RePEc:zag:zirebs:v:22:y:2019:i:sci2:p:73-91