EconPapers    
Economics at your fingertips  
 

Static Characteristic Analysis of Concrete-filled Steel Tube Tied arch bridge

Luo Xu ()
Additional contact information
Luo Xu: School of Mechanics and Architectural Engineering, Jinan University, Guangzhou, Guangdong Province

Acta Mechanica Malaysia (AMM), 2018, vol. 1, issue 1, 12-15

Abstract: Based on a concrete-filled steel tube rigid frame tied arch bridge, the finite element model of the bridge is built with large general structure finite element program ANSYS. Each construction stage will be considered as the real engineering too, so to determine the design tensile force of the tie-bar in all stages. Though comparing the inner force of the arch rib with different arch axis coefficient, the reasonable arch axis shape will be identified finally. At last, stress superposition theory is used to check the stress in the arch rib; the related research results and conclusion can supply experience and practical reference to another homologous tied arch bridge.

Keywords: concrete-filled steel tube (CFST); tied arch bridge; static characteristic analysis; finite element model (search for similar items in EconPapers)
Date: 2018
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)

Downloads: (external link)
https://actamechanicamalaysia.com/download/645/ (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:zib:zbnamm:v:1:y:2018:i:1:p:12-15

DOI: 10.26480/amm.01.2018.12.15

Access Statistics for this article

Acta Mechanica Malaysia (AMM) is currently edited by Dr. Alias B. Mohd

More articles in Acta Mechanica Malaysia (AMM) from Zibeline International Publishing
Bibliographic data for series maintained by Zibeline International Publishing ( this e-mail address is bad, please contact ).

 
Page updated 2025-03-20
Handle: RePEc:zib:zbnamm:v:1:y:2018:i:1:p:12-15