EconPapers    
Economics at your fingertips  
 

South African E-Toll Consultation SAGA: Corporate Governance Lessons for Public Consultation in Mega-Projects

Nthatisi Khatleli

A chapter in Corporate Governance - Recent Advances and Perspectives from IntechOpen

Abstract: Mega-projects have unfortunately gained a bad name the world over. The electronic-tolling project in Johannesburg called the GFIP (Gauteng Freeway Improvement Project) is one such project. The perfunctory consultation initiative in an environment where the legislation is not robust and the corporate governance is still fledging led to opportunistic behaviours characterised by malicious compliance. The take home lesson especially in these high dollar projects is to be prescriptive on the consultation process that is backed by a well-thought-out legal framework. The scrutiny of documents and interviewing all the stakeholders was insightful and instructive even to other jurisdictions. Notably that a shallow and limited consultation drive is counter-productive. For a consultation drive to yield desired results it has to be deliberate, aggressive and tailor-made to suit contextual exigencies.

Keywords: corporate governance; E-tolling; mega projects; public consultation; South Africa (search for similar items in EconPapers)
JEL-codes: M14 (search for similar items in EconPapers)
References: Add references at CitEc
Citations:

Downloads: (external link)
https://www.intechopen.com/chapters/80806 (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ito:pchaps:246781

DOI: 10.5772/intechopen.103054

Access Statistics for this chapter

More chapters in Chapters from IntechOpen
Bibliographic data for series maintained by Slobodan Momcilovic ().

 
Page updated 2025-03-31
Handle: RePEc:ito:pchaps:246781