EconPapers    
Economics at your fingertips  
 

Balancing Hedging and Flexing for Inclusive Project Management

Wim Leendert Leendertse, Bert De Groot and Tim Busscher

A chapter in Project Management - New Trends and Applications from IntechOpen

Abstract: Current project management often emphasizes hedging through a strictly phased and funneled development of the project scope. However, an increasingly engaged project environment and rise in the complexity of societal challenges cause an emerging demand for more open and interactive ways of managing projects. This requires projects to adopt an integrated management approach that focuses on flexing, which emphasizes the ability of a project to adapt to and co-create with the environment. Overemphasizing flexing, however, may undermine the controlled nature of project management. Therefore, it is necessary to find a form of project management that is both open and interactive without losing control. On the basis of specific project contexts and characteristics, this chapter presents criteria and tools for balancing hedging and flexing for inclusive project management.

Keywords: project management; hedging; flexing; stakeholder participation; project flexibility (search for similar items in EconPapers)
JEL-codes: O20 (search for similar items in EconPapers)
References: Add references at CitEc
Citations:

Downloads: (external link)
https://www.intechopen.com/chapters/80714 (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ito:pchaps:257724

DOI: 10.5772/intechopen.102972

Access Statistics for this chapter

More chapters in Chapters from IntechOpen
Bibliographic data for series maintained by Slobodan Momcilovic (ai@intechopen.com).

 
Page updated 2025-04-09
Handle: RePEc:ito:pchaps:257724